I know that this is probably the silliest thing to “update/upgrade”, but the house numbers and the mailbox look like crap…and it gets me every time I drive up to the house. Half of the 4 was chipped off, the reflector back ground was NO longer reflective and the entire box was sun faded. The picture below is from the house listing pictures and doesnt show how beat up the numbers were…and I forgot to take a before picture…
I havent decided if I am going to paint the post (or possibly replace it), but it needs new numbers. and I do not want the sticky numbers, something a little more solid looking.
Found what I wanted on Amazon : 5″ Zinc Alloy Style Emotionlite Floating White House Address Numbers. I love the look of the floating numbers and they are nice and big, I’m sure the mailman will like them 🙂
I couldn’t remove the old ‘stick-on’ numbers, so I decided on a new mailbox…nothing fancy, just new…home depot had the replacement I was looking for, but they recommended buying a new board to screw to the post and then screw the mailbox to it…1x8x16″…they wanted around $20 for that. You can buy a 6 foot 1×8 for less than that…what the hell?? Good thing I had a 1x10x20 in the garage…took a minute to cut it 🙂
Late afternoon, July 16, 2024 there was a ‘straight line storm’ that blew through here made a mess in the backyard (as well as all of East Fallowfield).
I was watching the rain from the bedroom window, it was going in so many different directions that you couldn’t see anything more than a few feet away, but I heard the crack. I couldn’t even see it, but I thought it was only a branch…I was wrong! The lily poplar was DOWN! I am glad it didn’t fall towards the house or take out the neighbors chicken coop/condo. Chasing chickens around in a lightening storm would NOT have been much fun!
A few minutes later, Jen was checking the tree out front when I heard the second crack. A BIG branch from the maple tree snapped and took out some of the ‘roses of sharon’ hedges between us and the Wilson’s house
it’s messier than it looks in this picturethis is from the Wilson’s yardJen in her natural form
The electricity was out until 3:30pm 7/18/2024…some hoses were still without power on Saturday the 20th. We worked by generator and ‘hot spot’…what a pain in the ass that was! I had my laptop ready to go, but still needed docs from the hard drive attached to my PC…everything took way longer than I wanted. My vacation started on Friday and I went to pick up Becky at the airport, so cleanup will have to wait! I ordered a Worx 10″ chain saw…this is the brand of all of my tools…same battery for everything. (I may borrow my friend, Ronnie’s 16″ gas chainsaw for the final push, we shall see!)
July 23July 23July 23
On July 23rd, I went out and started the clean up of the maple tree since it fell into the neighbors yard. They also had a branch drop from their big tree and brought in a tree guy to clean it up….even the stuff from our tree that fell on their side. They asked us if we wanted to have them clear out our side too, but I really like being outside and this is a perfect excuse 🙂
I spend a few hours cutting things down to a more manageable size so that I can get some burnt and some to the curb for the Aug 5th monthly yard cleanup pickup. (So many rules, cant be longer than 6 feet or 4 inch circumference, it needs to be off the property line (so in the street) and it cant take longer than 15 minutes to pick up or they charge $30/15 minutes.) I still need to decide if I will cut the bigger stuff and split it. After I have the fireplace inspected in the family room, I may burn it there. Or if I need to find a place that will take it…don’t need to decide that now!
The garage and the shed have been the ‘drop all’ for everything that doesn’t have a place, since the day we moved in it’s been a chore trying to move around in there let alone get organized.
The garage is my “she-shed”…so far, I have added the shelves on the left, the workbench, the shelves over the workbench and a retractable extension cord from the ceiling. As far as the ‘organization’ of it, it is an ongoing project! I really need to figure out how to get everything OFF of the workbench so I can use it!
The shed, I had started with shelves on the right and shelves on the left, but it felt a little too claustrophobic…I want to eventually put the riding mower and the push mower in there (not sure that’ll all fit AND the bikes!
Finally completed the powder room. It feels like it took forever! There are a couple minor things that still need to be done, but for the most part, I love the final outcome!
With everything happening around the house, we still need to play. So when my co-worker told me that he had a slot to play the organ at Longwood Gardens, we got tickets!
I need to keep reminding myself on a daily basis of a few things.
I can only complete one thing at a time. Whatever isn’t a P1 priority doesn’t have to be done right now. I need to lightened up on myself and stop beating myself up for not getting it all done. Most important, HAVE FUN!
The frustration comes in when I need “one more thing” to do the next step! I have gotten so much better at thinking it all through, but there is always going to be something.
Another trip to Lowes or HomeDepot to get that one thing…or worst, to return/exchange something that is broken/defective! The drive to Lowes or HD is alot further than it used to be. (Good thing it’s a beautiful drive!)
work, there is always something that can keep me at my desk! I need to get better at starting later and hard stops at the end of the day!
And for those moments that I have time, I need energy!
before we moved…maybe March 2023, I bought myself a small sketch book! I have done this off and on over the years and end up with a blank sketch book (that one of the kids end up getting)….but for some reason, this one was different, I started drawing again. Nothing serious, just few things here and there. Whatever inspired me…
I have been trying different mediums, but I always find myself going back to graphite.
When it was time to move and I started going through all of my older drawings and started feeling a bit under talented, so I shoved the drawings all in a box (and I thought I threw away the box before the move). But I found them today and thought I would show them off a little! These drawings are from high school and after and not very ‘protected’!
March 17th “J & V Patio” started, they moved and broke down the cement steps (they were not even attached to the house) and dug the holes for the footers (total of 14), now we have to wait for the inspectors to come out and measure.
While we wait for the township, the deliveries start…wood, cement, lattice, and deck hardware
March 21st, Inspection done! There was an extra footer hole that was needed but not on the plan submitted to the township. The paperwork will need to be updated and also kept on-site. But construction can begin!